Department of Transportation

 

 

Conndotlogo

 

 

At a Glance

 

JEFFREY A. PARKER, Commissioner

Established – October 1, 1969

Statutory authority - P.A. 69-768

Central office – 2800 Berlin Turnpike,

Newington, CT 06131-7546

Authorized number of full-time employees – 3,294

Recurring operating expenditures – $516.9 million

Capital Budget – $848.5 million

Organizational structureOffice of the Commissioner, Bureau of Aviation and Ports, Bureau of Finance and Administration, Bureau of Engineering and Construction, Bureau of Highway Operations, Bureau of Policy and Planning, Bureau of Public Transportation, State Traffic Commission.

 

 

 

Mission

The mission of the Connecticut Department of Transportation Department (Department) is to provide a safe and efficient inter-modal transportation network that improves the quality of life and promotes economic vitality for the State and the region.

 

Statutory Responsibility

     The agency shall be responsible for all aspects of the planning, development, maintenance and improvement of transportation in the State (Section 13b-3 C.G.S.). The agency serves its customers by providing safe and efficient systems for the movement of people and goods within, to or from the State, whether by highway, air, water, rail or other means (Section 13b-2[I]).

 

 

Information Reported as Required by State Statute

      The agency shall develop and revise, biennially, a comprehensive long-range transportation plan designed to fulfill the present and future needs of the State and to assure the development and maintenance of an adequate, safe and efficient transportation system (Section 13b-15 C.G.S). The purpose of the Master Transportation Plan is to provide its customers, the Administration, the General Assembly, local elected officials, and the general public with a comprehensive understanding of the transportation projects and programs that the agency will be pursuing over the next 10 years.  The strategic goals of the agency are to ensure safety, maintain the existing system, increase system productivity, promote economic development and provide required capacity.

 

Affirmative Action Policy

     The Department of Transportation is an Affirmative Action/Equal Opportunity Employer.  It is the established policy of the Department to ensure equal opportunity and to implement various affirmative action programs.  All services and programs of the Department are administered in a fair and impartial manner, pursuant to the State Code of Fair Practices and all other relevant State and federal laws and regulations including, but not limited to:  C.G.S. 46a-60, Title VI and VII of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA).  The Department continues to work cooperatively with the Connecticut Commission on Human Rights and Opportunities, the U. S. Department of Transportation and other State and Federal compliance agencies in conducting various reviews and providing requested information.

 

 

Improvements/Achievements 2009-10

     For the Bureau of Aviation and Ports, FY 2009 was another year focused on adapting to organizational changes, planning and implementing infrastructure improvements and responding to economic upheaval in the airline sector.

 

     Adapting to Organizational Changes – In FY 2009, the Bureau successfully adapted to organizational change brought on by the Department’s continuing efforts at reorganization, continuous improvement and the State’s Retirement Incentive Program (RIP).

 

 

 

 

     Planning and Implementing Infrastructure Improvements – The Bureau is continuing its development of all the State-owned Airports and Waterways. 

 

 

 

 

       Responding to Economic Upheaval in the Airline Sector – The airline industry was plunged into economic turmoil in FY 2008 by the rising cost of fuel and declining economy.  This has only worsened in FY 2009.  Most major airlines are in “survival mode” and have instituted major cuts in airline service capacity in response to the situation.  The Bureau has implemented a plan to address the situation:

 

 

 

 

 

The airlines unanimously approved the FY 2010 budget as a result of the actions taken and the Bureau is positioning Bradley to take maximum advantage of the airline business cycle when it again enters an expansion era.

 

       The Bureau of Engineering and Construction managed all programs and projects to maximize federal funds allocated to Connecticut for improvements to all transportation modes.  In addition, as of September 20, 2010 the Bureau has obligated all American Recovery and Reinvestment Act (ARRA) funds for State and municipal projects.

 

      Major projects undertaken during this period include the upgrade of the New Haven Rail Yard and Facilities, the West Haven Railroad Station, resurfacing and safety improvements on I-95 in East Lyme, bridge rehabilitation and catenary system installation and improvements along the Metro-North rail system.  The reconstruction of the major runways at Bradley International Airport; repairs to the I-84 Aetna Viaduct in Hartford; the replacement of the Amtrak Railroad bridge over Route 1 in Branford; the construction of Route 7 (Brookfield Bypass); the reconstruction of Route 7 in Danbury; the rereconstruction of I-95 in New Haven; the resurfacing of Route 15 in Trumbull and Fairfield; the relocation of Route 72 in Bristol; the rehabilitation and widening of the Route 190 Bridge in Suffield and Enfield; the reconstruction of the Grand Avenue Bridge in New Haven; the construction of the Fairfield Metro Center Railroad Station; railroad system improvements on Bridgeport; the construction of a bus facility in New Haven; the reconstruction of Route 20 in East Granby; the reconstruction of the Route 63 Bridge over the Naugatuck River in Naugatuck; the replacement of the existing Bridge over the Housatonic river in Salisbury; safety and operational improvements on Route 44 in Avon; the reconstruction of route 4 in Farmington; and various other safety and operational improvements throughout the State.

 

      The largest Capital Program within the Department’s current plan is the I-95 New Haven Harbor Crossing Corridor Improvement Program.  The Program includes both roadway and transit improvements to increase capacity and reduce congestion between New Haven and Branford. The reconstruction and widening of I-95, east of the existing Quinnipiac River Bridge (the Q-Bridge), in New Haven, East Haven and Branford, was completed in 2008.  Three lanes on I-95 southbound are now open from Interchange 54 in Branford to the existing Q-Bridge in New Haven (4.5 miles).  The foundation and west approach construction for the new Pearl Harbor Memorial Bridge (replacement of the Q-Bridge) commenced in April 2008 and construction of the I-95 northbound to Route 34 eastbound flyover commenced in October 2008.  The contract to construct the new Pearl Harbor Memorial Bridge commenced in November 2009. The major work to reconstruct the I-95/I-91/Route 34 Interchange was advertised for bids in spring 2010.  The bid opening will occur in October 2010 with construction commencing in spring 2011.  The entire New Haven Crossing Corridor Improvement Program is estimated to cost over $2.2 billion and will be completed in late 2016.

           

       The design of the New Britain-Hartford Busway is expected to be completed by the end of 2010.  Construction is expected to start in 2011 and take approximately two years, resulting in an anticipated revenue operations date for the bus rapid transit system of 2013.

 

 

 

      The Department’s Bridge Safety and Evaluation Section continued to aggressively inspect, evaluate and inventory the structural condition of more than 5,000 bridges, 1,800 overhead sign supports, 900 traffic signal mast arm supports.   Bridges are typically inspected at two-year intervals; however, some bridges are inspected more frequently due to significant structural deterioration.  This critical function helps to ensure the safety of the traveling public through the identification of bridge deficiencies and needs in a systematic and timely manner.

 

      The Department’s Utilities Section with the cooperation of the Connecticut Siting Council (CSC) in accordance with the Governor’s Office’s request to preserve and protect the Department’s forgotten Scenic Lands has successfully modified its procedure for reviewing the application of the new telecommunication tower in the State to ensure the location of the proposed telecommunication tower will not impact the State’s scenic lands. The Department has successfully worked with the Department of Environmental Protection, the Council on Environmental Quality, the CSC and the Governor’s Office to address all concerns related to the State’s Scenic Lands.

 

      The Department’s Utilities Section and the Office of Construction are continuing with their efforts ensure the impacts of the newly installed underground 345 kilovolt (kV) transmission facilities to the Department’s current and future roadway improvement projects will be adequately addressed. However, as a result of the transmission facility conflicts with the State Projects, any reasonable costs incurred by the Department to resolving the conflicts within State’s projects will be reimbursed to the State by either the United Illuminating Company or The Connecticut Light and Power Company (CL&P).

 

       Additionally, CL&P has submitted to the Department for review their proposed Development and Management (D&M) Plans for the construction of approximately 2.7 miles of new overhead 345 kV transmission line within an existing right-of-way from Manchester to Meekville Junction in Manchester which will be crossing various state roads. The D&M Plans are currently under review by the Department. This Transmission Project is part of the New England East-West Solution for additional electrical transmission facilities.  Whenever State highways may be affected, the Department will continue to cooperate on future transmission projects. NU’s multi-billion dollar transmission projects have placed Connecticut at the forefront in resolving existing problems with the regional transmission system attaining national and regional reliability standards, thus assuring the adequacy and availability of electric power.

 

       The Department’s Office of Rights of Way completed 137 acquisitions of real property for various transportation initiatives at a cost of $10,577,670.00.  A total

 of 142 relocation payments were made to displaced residential and business owners and tenants at a cost of $1,063,583.00.  Some 31 parcels of State land were sold during the year producing $1,639,186.00 in sales revenue.  Long- and short-term leases of State highway property produced $1,632,120.00 in rental income.

 

       The Bureau of Maintenance and Highway Operations provided roadway and roadside maintenance to 5,682 effective two-lane miles of roadway and provided snow removal and other roadway maintenance services to 61 State agencies. With respect to snow and ice control, there were 12 winter storms which required the use of 175,000 tons of sodium chloride and 752,268 gallons of liquid calcium chloride and 0 cubic yards of sand abrasives applied by 632 State trucks and 212 contracted trucks. Maintenance of existing roadways included 276.16 miles of vendor-applied bituminous concrete overlay.  In addition, 9,045 feet of drainage pipe was installed along with 451 drainage structures. During the past year, maintenance repairs were performed on 940 of the 3,831 state-maintained bridges through the combined efforts of Department personnel and contractors. The Traffic Services Units painted 5,083 2-lane miles of center lines and lane lines; erected 2,536 new traffic regulatory, warning and directional signs; renewed or removed 6,602 miles containing 22,060 of state maintained highway illuminating lights and installed 6 new traffic signals and 121 traffic signal revisions.

 

       There were 3,219 highway encroachment permits issued. The Oversize/Overweight Permits Unit collected $2,516,306.90 for the issuance of 81,533 oversize/overweight permits, 294 radioactive permits and 193 industrial permits.

 

       The Department’s computerized traffic control signal systems include a total of 937 traffic signals on 58 major arterials in 54 municipalities. The Newington and Bridgeport Operations Centers monitor 311 highway cameras, operate 121 variable message signs and 14 highway advisory radio stations. The Operations Centers responded to a total of 2,935 reported incidents on the State’s limited access highway system. The Department’s Connecticut Highway Assistance Motorist Patrol (CHAMP) Program provided highway assistance to a total of 13,263 motorists along the I-95 corridor from the New York state line to the Branford/Guilford town line, in the greater Hartford area the CHAMP Program provided assistance to 9,859 motorists.

  

       The Bureau of Finance and Administration is responsible for the following functions within the Department:  Finance, Operations and Support, Office of Information Systems, Office of External Audits, Office of Human Resources, Office of Enterprise Funds and Contracts, and the Office of Organizational Development.  The following is a summary of some of the key initiatives being undertaken in the Bureau:

 

       A project closeout team was formed in the beginning of October 2008 with representatives from the Department’s operational areas and United State’s Department of Transportation, Federal Highway Administration (FHWA).  The Department seeks to close out projects and release unused State and federal funding for obligation on new projects.  The Department is moving forward and making progress with the Project Closeout and Final Voucher initiative, closing 286 projects in FY 2010 and releasing $7,596,339.32 in federal funding.  Our goal for FY 2011 is 300 projects.

 

      Unexpended balances are a focus for the FHWA, General Accounting Office, as well as Congress.  FHWA and Congress do not want federal funds sitting stagnant and not providing transportation improvements.  In 2009, Connecticut's federal inactive funding balances ranked second worst in the nation.  In November 2009, FHWA and the Department entered into a Memorandum of Agreement (MOA) to reduce the federal inactive percentage from 14 percent to 5 percent by the end of FFY 2010.  An interim goal of 9 percent was set for the end of calendar year 2009.  Through mutual efforts, the Department beat the deadline articulated in the MOA and reduced its federal inactive list to below 5 percent by June 2010.  Today, by continuing to focus on inactive projects with unexpended balances, the Department has reduced the inactive balance to 3.3 percent of our total federal program.  By working with the project managers and having them provide a current status, the Department will be able to stay ahead of projects that will appear on the list in the future.

      The Department continues its efforts at streamlining its contracting and agreement processes.  In FY 2010, a Master Municipal Agreement (MMA) was drafted.  The objective is to execute a master funding agreement with the municipalities with the intent of reducing the time it takes the State to process funding agreements.  The MMA is anticipated to cover a 10 year term and incorporate all state and federal rules and regulations related to the funding programs the Department administers to the municipalities.  The MMA is designed to cover design projects, rights of way activities, construction projects, wheelchair accessible motor vehicle purchases, transportation services for the elderly and disabled and alternative fuel vehicle procurement.  In FY 2010, attorneys for the Department drafted the MMA working closely with the administering units.  The MMA was reviewed with the Regional Planning Organizations and feedback from their attorneys was incorporated.  The MMA was further reviewed with both the FHWA and Federal Transit Administration, with feedback incorporated as well.  The MMA is now under review at the Attorney General’s office.

 

       The Department has established a performance target for its Contracts unit to award construction projects within 60 days of the Department's receipt of bids.  During this 60 day period, the Contract's unit reviews all bids for accuracy, status of contractor qualifications, ensures that environmental permits and rights of way requirements are in order, verifies project funding is in place and ensures the proper federal approvals have been received.   Performance against this target is assessed regularly through self-reporting by the unit and this structure has served the Department well.  In FY 2010, 87 percent of all of the Department's awards met this target, in comparison to 51 percent being awarded in less than 60 days in FY 2009.  In addition to the reduction in days to award, the number of contracts awarded increased by 57 percent in this same period (from 54 awards in FY 2008 to 85 in FY 2009).

 

        The Department is presently preparing for the expiration of the 30 year air carrier operating agreement at Bradley International Airport that governs the Airport’s budget development and rate setting processes. 

 

       The Department entered into a 35 year Concessions Agreement with a new operator during SFY 2010 to operate the 23 Service Plazas located on I-95, I-395 and Route 15.  The Concessions Agreement requires the operator to redevelop the 23 plazas by May 2015.  The redevelopment calls for the knock-down and rebuilding of three locations and extensive renovations at the remaining locations.

 

      The Bureau of Policy and Planning conducts planning studies and associated activities for the movement of people and goods for all modes of transportation including highway, rail, bus, aviation, maritime, rideshare/commuter parking facilities, bicycle and recreational.  Documentation of proposed alternatives with environmental analyses are prepared for all proposed projects through a public process.  The Bureau interacts with Legislative and Congressional members and staff, as well as nationally recognized transportation organizations, on various transportation bills including major authorizations and appropriation bills for surface transportation, intercity passenger rail and aviation.

 

      The Bureau administered programs during the 2009-2010 fiscal year for commuter parking facilities, pedestrian access, bicycling, and Safe Routes to School.  This program provides support for infrastructure projects and educational training for bicycle and pedestrian safety.  The Bureau has assisted with the administrative functions of the new legislatively established CT Bicycle and Pedestrian Advisory Board.

 

       Continuing major studies include the Waterbury and New Canaan Branch Lines Study; Groton – New London Airport Master Plan; Interstate 84 (I-84) Waterbury – Danbury Environmental Impact Statement; Danbury Rail Branch Electrification Study (Phases I and II); and the I-84/Route 8 - Waterbury Interchange Needs and Feasibility Study.

 

      Major planning studies initiated include the Route 15 at Interchange 59 – Deficiencies and Needs Study (Woodbridge and New Haven) and the New Haven Rail Line.  The State Bicycle and Pedestrian Plan and Bicycle Map update, Buckland Area Transportation Study, Danielson Airport Master Plan Update, and the Waterbury – Oxford Airport Federal Aviation Regulation Part 150 Noise Study were completed.  The Bureau also prepared a Reevaluation of the Long Wharf Draft Environmental Assessment and the Final Environmental Impact Statement/Final Section 4(f) (FEIS/Section 4(f)) for the Interstate 95 (I-95) New Haven Harbor Crossing Improvements addressing necessary modifications to improve the weave distance between the I-95 Northbound on-ramps from Long Wharf and the I-95 to Route 34 westbound off-ramp.

 

      An Environmental Assessment for an improved or “Start-up” Commuter Rail Service from New Haven to Springfield had previously been initiated.  The focus has been expanded to include the potential for future High Speed and Intercity Passenger Rail service along this corridor.  The Bureau was involved in the preparation of grant applications, including the development of the 2030 Vision for High Speed and Intercity Passenger Rail Service in New England.

 

      The Bureau updated performance measures and targets for bridge and road conditions, photolog savings, congestion management, highway safety, recycling, project delivery, and rail, bus and airport operations.  A total of 31 measures are placed on the Department’s performance measures webpage on a quarterly basis for public access. The Bureau developed a Memorandum of Understanding (MOU) with the Department of Environmental Protection regarding implementation of Flood Management Certification for the Grant programs administrated by the Department. 

 

     The Bureau also coordinates with the State and federal regulatory agencies in order to obtain the required water resource permits.  In addition, the Bureau performs inspections of active construction sites to ensure compliance with permit conditions.

 

      The Bureau developed the 2010 Statewide Transportation Improvement Program (STIP) and has made modifications throughout the year.  The Bureau published a Public Involvement Procedures document after soliciting public comments.  The Bureau initiated the updating of the 2007 Transportation in Connecticut: Existing Systems document.  The Bureau had also been actively involved in the solicitation and scheduling of American Recovery and Reinvestment Act (ARRA) projects and the coordination of the approval of these projects through the Regional Planning Organizations (RPOs).  The Bureau is continuing its investigation into the use of an electronic Statewide Transportation Improvement Program (ESTIP) to facilitate project approvals between the Department, the RPOs and federal agencies.  The Bureau also developed various transportation planning-related documents and documentation required by the Federal Highway Administration (FHWA), and provided extensive support for the Transportation Strategy Board program initiatives.  Air quality conformity model runs were completed for various transportation projects to assure compliance with the Clean Air Act emission goals.  The Bureau also administers an ARRA funded diesel retrofitting program for non-road construction vehicles and equipment on construction projects aimed at reducing diesel emissions in New Haven and Fairfield Counties. 

 

       A survey was conducted and a report published on usage of High Occupancy Vehicle facilities in the Greater Hartford region.  Bureau staff represented the Department on the Neighborhood Revitalization Zone (NRZ) Advisory Board and coordinated the Department’s review and submittal of comments on various NRZ strategic plans. Staff also represented the Department at a hearing held by the Connecticut General Assembly’s Continuing Committee on State Planning and Development to obtain input from State agencies on the process for revising the State Plan of Conservation and Development (Plan) and provided input on integrating Smart Growth Principles into the Plan.

 

      The Bureau prepares an annual planning document, which addresses a set of highway and traffic safety problems with the goal of reducing fatalities and injuries as the result of motor vehicle crashes on Connecticut’s roads.  These traffic safety program areas include Impaired Driving, Occupant Protection and Child Passenger Safety, Police Traffic Services, Motorcycle Safety, Roadway Safety and Traffic Records.

 

      In addition, the Bureau maintains the State’s traffic counting program, accident records system and an inventory of the highway system.  This data, as well as future land use and employment projections, is used to estimate future travel demand, identify current and future capacity deficiencies, analyze alternate highway and transit improvement, and is used in environmental studies.

 

       The Bureau provides Geographic Information System software and application development support for the Department.  The Bureau has begun development of a new comprehensive digitized road network which comprises roughly 27,000 miles of roadways.  This network will support many high level initiatives such as evacuation planning, emergency response, capacity planning, oversized and overweight permitting and routing analysis.

 

      The Bureau of Policy and Planning has worked to develop a Memorandum of Understanding (MOU) with the Department of Environmental Protection regarding implementation of a Flood Management Certification for the Grant programs administrated by the Department. This MOU will streamline the Flood Management Certification process and avoid the duplication of effect within the two agencies.

 

     The Bureau of Policy and Planning published the 2009 Master Transportation Plan, the State’s long-range transportation plan titled, Connecticut on the Move, Strategic Long-Range Transportation Plan 2009 – 2035 (2009 LRP), and has completed the Public Involvement Guidance Manual, Revision of 2009.  The Bureau developed, with technical assistance from the Department’s Office of Research and Materials, a streaming video on the development and contents of the Draft 2009 LRP as part of the Department’s public outreach efforts to solicit public input on the document.  The Bureau also updated the existing 2007 Statewide Transportation Improvement Program (STIP) throughout the year and is in the process of developing the Draft 2010 STIP.  The Bureau has developed a draft Public Involvement Procedures document which will go out for public review late summer or early fall 2009. The Bureau has been actively involved in the solicitation and scheduling of American Recovery and Reinvestment Act projects from the Regional Planning Organizations (RPOs) throughout the State and continues to coordinate the review and approval of these projects through the RPO’s.  The Bureau also developed various transportation planning-related documents and documentation required by the Federal Highway Administration, and provided extensive support for the Transportation Strategy Board program initiatives, studies and projects.  The Bureau continues to participate in various planning studies Statewide in coordination with the RPO’s and other State agencies.  Air quality conformity model runs were completed for various transportation projects to assure compliance with the emissions goals of the Clean Air Act.  A survey was conducted and a report published on usage of High Occupancy Vehicle facilities in the Greater Hartford region.  Bureau staff also represented the Department on the Neighborhood Revitalization Zone (NRZ) Advisory Board and coordinated the Department’s review and submittal of comments on various NRZ strategic plans, and gave a power point presentation on “ConnDOT’s Functions” and the planning process to participants in the Danbury Leadership Program and the Fairfield County Leadership Group.  Bureau staff provided technical support for the Governor’s Steering Committee on Climate Change.

 

      The Bureau of Policy and Planning prepares an annual planning document which addresses a set of highway and traffic safety problems with the goal of reducing fatalities and injuries as the result of motor vehicle crashes on Connecticut roads.  These traffic safety program areas include Impaired Driving, Occupant Protection and Child Passenger Safety, Police Traffic Services, Motorcycle Safety, Roadway Safety and Traffic Records.  Also included is the Safe Routes to School program, which provides support for infrastructure projects and educational training for bicycle and pedestrian safety, and Operation Lifesaver, a national non-profit public information program dedicated to improving public safety by reducing the number of injuries and fatalities associated with at-grade railroad crossing crashes and accidents involving railroad trespass.

 

      In addition, the Bureau of Policy and Planning maintains the State’s traffic counting program, accident records system and an inventory of the highway system.  This data, as well as future land use and employment projections, is used to estimate future travel demand, identify current and future capacity deficiencies, and analyze alternate highway and transit improvement – and is used in environmental studies.

 

     The Bureau of Policy and Planning provides Geographic Information System software and application development support for the Department.  The Bureau has begun development of a new comprehensive digitized road network which comprise approximately 27,000 miles of roadways.  This network will support many high-level initiatives such as evacuation planning, emergency response, capacity planning, oversized and overweight permitting, and routing analysis.

     

     The Bureau of Public Transportation’s mission is to provide mobility to the residents of the State; enhance economic development; ensure access to jobs; and improve environmental quality by providing safe, efficient, economical and reliable transportation alternatives.

 

      Ridership growth has been uneven this year (when compared to SFY 2009) as commuters and discretionary riders were affected by the overall economic downturn which has negatively impacted all modes of travel. 

 

     Rail ridership was down 4.2 percent on the New Haven Line over the first six months of fiscal 2010 (July through December 2009) and then rebounded in the second half (January through June 2010) showing a 2.0 percent increase.  Rail ridership was down 11.0 percent on Shore Line East over the first six months of fiscal 2010 and then rebounded in the second half (January through June 2010) showing a 0.7 percent decrease.  New train service to/from New London was added in the second half of SFY2010.  Eight new trains were added to further expand service to New London and southeast Connecticut.

 

      New train services to Yankee Stadium and to the Meadowlands Stadium in New Jersey were implemented and have generated additional New Haven Line ridership and revenues.

 

      The Office of Rail directed stimulus funds made available through the American Recovery and Reinvestment Act (ARRA) to a rail signalization project on the Danbury Branch, rail station improvements on the New Haven Line and the construction of a major rail car facility in New Haven to inspect and maintain the new M8 rail cars.  

 

     Bus ridership was down by about 2 percent over the course of the 2010 fiscal year, but has now stabilized and is increasing slightly as the economy has stabilized or begun a slow recovery.  No significant service additions or reductions were implemented daring the past year. 

 

     The Transit Office facilitated the development of a package of capital improvements in response to the funding made available through the ARRA economic stimulus program.  Over $75 million of new bus capital funding was made available to the state and its transit systems.  A procurement of 136 buses was competed using ARRA funds as well as several smaller projects including park and ride lot improvements and three fixed asset projects at local transit districts.  The Office also updated the statewide specialized transportation services plan to meet SAFETEA-LU planning requirements. 

 

     Over the past year substantial progress has been made in advancing the Bureau’s long-term capital agenda.  Major activities and achievements during the year include:

 

1.      Continued construction of catenary (electric overhead wire) replacement and bridge rehabilitation from New Haven to the New York State line on the New Haven Main Line.

2.      Initiated the design and construction phase for priority improvements at New Haven Line train stations (ARRA construction project).

3.      Continued inspections and condition studies for New Haven Line rail bridges.

4.      Continued the track maintenance program, bridge timber replacement program and railroad bridge maintenance program.

5.      Continued the rehabilitation of the State’s M2 electric multiple unit (EMU) rail cars to ensure reliable New Haven Line service.  Reviewed long-term rolling stock train equipment requirements for New Haven Line service.

6.      Completed the reconditioning of 33 rail cars purchased from the state of Virginia in order to provide additional seating capacity on the New Haven Line and Shore Line East.

7.      Received delivery of “pilot” M8 EMU cars for extensive testing before deployment of M8s into passenger revenue service in late 2010.

8.      New signal system construction continues from the state line to Greenwich.  Funding needed to continue design and construction of this signal system upgrade from Greenwich to New Haven.

9.      Worked with Metro-North Railroad to develop Implementation Plan for federally-mandated Positive Train Control (PTC) on New Haven Line.

10.        Began construction of the Component Changeout Shop in the New Haven Rail                                                              Yard (NHRY) Master Complex.  Continued the construction of the new locomotive Fueling Facility.  Continuing the design phases for NHRY program.

11.        Continued construction of the access roadway bridge, station boarding platforms and pedestrian overpass for the new Fairfield Metro Station.  The program will include parking for 1,500 cars.  Settlement with developer and Town of Fairfield on completion of drainage and parking projects at station.

12.        Advanced the design phase for additional rail parking facilities in Stratford and Stamford.  Began design for additional parking at Union Station in New Haven.

13.        Continued the design and property acquisition phases for a new station in West Haven, which will include 700 surface parking spaces.

14.        Continued the Environmental Assessment for a new station in Orange, which is expected to include 1,000 parking spaces.

15.        Continued design for the rehabilitation of the Walk (over the Norwalk River) and Saga (over the Saugatuck River) movable bridges on the New Haven Line.

16.        Continued the structural feasibility study for the rehabilitation of the Devon (over the Housatonic River) and Cos Cob (over the Mianus River) movable bridges on the New Haven Line.

17.        Began procurement of material and equipment for construction phase of Danbury Centralized Traffic Control (CTC) signal project.

18.        Began development of New Haven-Hartford-Springfield (NHHS) High Speed Rail (HSR) and Corridor improvement plan.  Received FRA HSR grant to double track 10-mile segment on NHHS.  Bond Commission approved $26m to match FRA grant and to develop long-term NHHS plan.

19.        Continued work on federally-required State Rail Plan.  Met with major stakeholders for input and comments.

20.        Continued design for the expansion of the Shore Line East stations including north side platforms, pedestrian overpasses and parking expansion at Branford, Guilford, Clinton, Madison and Westbrook.

21.        Completed a procurement effort to purchase up to 136 replacement buses and vans for transit operators statewide in fiscal 2010 and hundreds of additional vehicles over the final four option years of the procurement.  Awards were made in October 2009 and deliveries of the first year’s purchase will be completed by February 2011.

22.        Completed construction of a new 250,000 square foot bus maintenance and storage facility in Hamden for the CTTransit New Haven Division in September 2010.

23.        Continued final design and rights-of-way activities for the New Britain-Hartford Bus Rapid Transit project.  In December 2009, initial submittals were made requesting a Full Funding Grant Agreement from the Federal Transit Administration.

24.        Continued planning activities for new bus storage and maintenance facilities in Watertown for the CTTransit Waterbury division and smaller facilities for the Northwest Connecticut Transit District and the Windham Transit District.

 

 

ANNUAL ADMINISTRATIVE REPORT

OFFICE OF HIGHWAY OPERATIONS

2009-2010

District 1

District 2

District 3

District 4

State Total

Surface Treatment - VIP

74

51.17

93.80

57.19

276.16

Miles

Surface Treatment - Thin Surface (Treatment By State Forces)

0

1.67

9.00

4.25

14.92

Miles

Surface Treatment - Liquid Treatment

0

0

0

0

0.00

Miles

Drainage Pipe Installed

2200

5,485

1,840

1,500

11,025.00

Lineal Feet

Drainage Structures Completed

410

11

12

18

451.00

Number

State Agencies Served

7

34

5

10

56.00

Number

Training Courses (Separate Sessions)

169

204

237

195

805.00

Number

Training Subjects Covered

41

53

41

61

196.00

Number

New Signs Erected

1721

237

86

492

2,536.00

Number

Existing Signs Replaced

3836

1,093

346

1,327

6,602.00

Number

Centerline and Laneline Marking

1927

1,157

365

1,634

5,083.00

2-Lane Mile

Traffic Control Signals (Maintenance)

5082

587

1,106

654

7,429.00

Number

New Traffic Control Signal Installation

0

2

0

6

8.00

Number

New Traffic Control Signal Revisions

11

14

77

19

121.00

Number

Highway Illumination

122

240

400

185

947.00

Miles

Encroachment Permits Issued

924

739

1,027

863

3,553.00

Number

Encroachment Permit Investigations

2,947

1,801

4,950

820

10,518.00

Number

Drainage Investigations

1,600

1,240

620

475

3,935.00

Number

Traffic Investigations

1,600

745

350

1,387

4,082.00

Number

Claims Investigations

309

79

268

119

775.00

Number

Landscape Investigations

575

754

1,753

960

4,042.00

CBYD Request

8,086

8691

720

4445

21942

Signal Complaints

1,520

2236

1200

3120

8076

Signal Loop Detection Replaced

83

30

0

23

136